§ 26-198. Permits—Types.  


Latest version.
  • (a)

    The permits required by this section shall be obtained prior to the commission of the act(s) or the commencement of any work as described in section 26-197.

    (b)

    Written permits required by this division are:

    (1)

    Driveway permits for construction of a driveway to access a public street, alley or right-of-way. The construction of a driveway over a drainage ditch must be permitted by the city to ensure that the full capacity of the ditch is preserved by an adjacent culvert;

    (2)

    Encroachment permits for work done on public property, easements or right-of-way;

    (3)

    Grading permits for work which affect a watercourse and/or when the total volume of cut or fill material is one hundred fifty (150) cubic yards or more;

    (4)

    Drainage way alteration permit for construction, alteration or repair to any stormwater drainage structure, drainage way or drainage facility.

(Ord. of 7-6-04, § 1)